
Add to Cart
60 Ton Welding Rotators Positioners Wind Tower Fit Up Rotators Hydraulic Cylinder Jacking
Stable Rotating process
The ZHGK60 Wind Tower Fit-up rotator is developed from Conventional Rotator.
The wind tower is normally consists of more than 20 section pipes. Customers need to fit-up the sections 1+1, 2+2,….,10+10…. If they do like this, they need to buy a lot of rotators and big loading capacity crane.
This Wind Tower Production Line can help customer to fit-up the section 1+1+1+…+1, or 2+2+2+…+2. On this way, customer only needs some production lines and small cranes. Then they can produce some towers at the same time.
Features of Wind Tower Production Line
Delivery Scope of Wind Tower Production Line
Main Technical Parameters of Wind Tower Production Line
This kind of production is specializing designed according to customer’s requirement. This rotator need to work with Welding Rotators.